Chineham Battery Energy Storage Facility
A 15 MW battery storage site in Basingstoke and Deane, South East. Application withdrawn. The developer on record is Camborne Energy Storage.
- Size
- 15 MW
- Stage
- Application withdrawn
- Council
- Basingstoke and Deane
- Region
- South East
- Developer
- Camborne Energy Storage
- Application made
- July 2016
What this stage usually means
Not going ahead as applied for. Withdrawn sites are often brought back with a new application.
Stanfell sends new battery storage sites the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other battery storage sites in Basingstoke and Deane
- Frog Lane, Little London - Battery Energy Storage
115 MW. Refused. Basingstoke and Deane, South East.
- Minchens Lane Battery Storage Facility
100 MW. Running. Basingstoke and Deane, South East.
- Ash Lane, Little London - Battery Storage
57 MW. Consented, not yet built. Basingstoke and Deane, South East.
- Withy Place, Bramley Road - Battery Energy Storage
50 MW. Consented, not yet built. Basingstoke and Deane, South East.
- Basing Road battery storage
20 MW. In planning. Basingstoke and Deane, South East.
- Old Rides Farm, Leysdown Road - Battery Energy Storage System
1,000 MW. In planning. Swale, South East.
- Southampton Battery Energy Storage
1,000 MW. In planning. Southampton, South East.
- Stable Green, Sand Hill Lane - Battery Energy Storage System
600 MW. Consented, not yet built. Wealden, South East.
Battery storage sites in the South East · The companies behind them