Culham Science Centre battery storage
A 250 MW battery storage site in South Oxfordshire, South East. Abandoned. The developer on record is CESL UK Atomic Energy Authority.
- Size
- 250 MW
- Stage
- Abandoned
- Council
- South Oxfordshire
- Region
- South East
- Developer
- CESL UK Atomic Energy Authority
- Application made
- July 2016
What this stage usually means
Not going ahead.
Stanfell sends new battery storage sites the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other battery storage sites in South Oxfordshire
- Culham Science Centre, Clifton Hampden - Battery Storage Facility
500 MW. Consented, not yet built. South Oxfordshire, South East.
- Cowley Substation, Blackberry Lane - Battery Storage Energy System
200 MW. Consented, not yet built. South Oxfordshire, South East.
- Lower road, Garsington - Energy Storage System
100 MW. Refused. South Oxfordshire, South East.
- Burcot Farm Battery Storage
50 MW. Application withdrawn. South Oxfordshire, South East.
- Cowley electricity sub-station battery storage
50 MW. Running. South Oxfordshire, South East.
- Old Rides Farm, Leysdown Road - Battery Energy Storage System
1,000 MW. In planning. Swale, South East.
- Southampton Battery Energy Storage
1,000 MW. In planning. Southampton, South East.
- Stable Green, Sand Hill Lane - Battery Energy Storage System
600 MW. Consented, not yet built. Wealden, South East.
Battery storage sites in the South East · The companies behind them