Frome Power, Styles Close - Energy Storage Facility
A 30 MW battery storage site in Somerset, South West. In planning. The developer on record is Trina Solar UK Hold Co Limited.
- Size
- 30 MW
- Stage
- In planning
- Council
- Somerset
- Region
- South West
- Developer
- Trina Solar UK Hold Co Limited
- Application made
- June 2023
What this stage usually means
A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.
Stanfell sends new battery storage sites the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other battery storage sites in Somerset
- Summerway Drove, East Bower - Battery Storage
90 MW. Consented, not yet built. Somerset, South West.
- St Georges Cross Farm, Berkley Lane - Battery Energy Storage
60 MW. Refused. Somerset, South West.
- Taunton Substation battery storage
50 MW. Consent lapsed. Somerset, South West.
- Fideoak Mills battery storage
30 MW. Running. Somerset, South West.
- The Transmitting Station, Williton - Battery Storage (Wyndham Estate)
20 MW. Consented, not yet built. Somerset, South West.
- Hele Manor Farm, Bradford On Tone - Battery Storage System
20 MW. Consented, not yet built. Somerset, South West.
- Smithyard Lane - Battery Storage
15 MW. Consented, not yet built. Somerset, South West.
- Ash Farm, Charlton Road - Battery Storage System
10 MW. Consented, not yet built. Somerset, South West.