Land Southwest of Hightown Drove, Burwell - Battery Energy Storage System
A 90 MW battery storage site in East Cambridgeshire, East of England. Refused. The developer on record is Grenergy Renewables UK Limited.
- Size
- 90 MW
- Stage
- Refused
- Council
- East Cambridgeshire
- Region
- East of England
- Developer
- Grenergy Renewables UK Limited
- Application made
- July 2025
What this stage usually means
Not going ahead as applied for. Refused sites are often brought back with a new application.
Stanfell sends new battery storage sites the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other battery storage sites in East Cambridgeshire
- Wicken Bridleway, Church Road - Battery Energy Storage
400 MW. Consented, not yet built. East Cambridgeshire, East of England.
- Newmarket Road, Bottisham - Battery Energy Storage
50 MW. Consented, not yet built. East Cambridgeshire, East of England.
- Burwell - Battery Storage
50 MW. Running. East Cambridgeshire, East of England.
- Anchor Lane, Burwell - Battery Energy Storage
50 MW. Consented, not yet built. East Cambridgeshire, East of England.
- Reach Road battery storage
50 MW. Consented, not yet built. East Cambridgeshire, East of England.
- Weirs Drove, Burwell - Battery Storage Facility
30 MW. In planning. East Cambridgeshire, East of England.
- Red House Farm, Old Norwich Road - Battery Energy Storage System
520 MW. In planning. Mid Suffolk, East of England.
- Sundon, Chalton - Battery Energy Storage System
500 MW. Consented, not yet built. Central Bedfordshire, East of England.
Battery storage sites in the East of England · The companies behind them