Lower Dunton Road - Battery Energy Storage System
A 368 MW battery storage site in Basildon, East of England. In planning. The developer on record is LJ Construction UK Limited.
- Size
- 368 MW
- Stage
- In planning
- Council
- Basildon
- Region
- East of England
- Developer
- LJ Construction UK Limited
- Application made
- October 2024
What this stage usually means
A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.
Stanfell sends new battery storage sites the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other battery storage sites in Basildon
- Rayleigh Spur Roundabout, Benfleet - Battery Energy Storage System
150 MW. Refused. Basildon, East of England.
- Dollymans Storage
100 MW. Running. Basildon, East of England.
- Whites Farm - Battery Storage
50 MW. Refused. Basildon, East of England.
- Nevendon battery storage
10 MW. Running. Basildon, East of England.
- Red House Farm, Old Norwich Road - Battery Energy Storage System
520 MW. In planning. Mid Suffolk, East of England.
- Sundon, Chalton - Battery Energy Storage System
500 MW. Consented, not yet built. Central Bedfordshire, East of England.
- Fairlawns Farm, Chelmsford Road - Battery Energy Storage
480 MW. Consented, not yet built. Rochford, East of England.
- Gateway Energy Centre - Battery Energy Storage
450 MW. Consented, not yet built. Thurrock, East of England.
Battery storage sites in the East of England · The companies behind them