Bonnyknox Solar Farm
A 50 MW solar farm in Angus, Scotland. In planning. The developer on record is Renewable Energy Systems (RES).
- Size
- 50 MW
- Stage
- In planning
- Council
- Angus
- Region
- Scotland
- Developer
- Renewable Energy Systems (RES)
- Application made
- July 2025
What this stage usually means
A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.
Stanfell sends new solar farms the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other solar farms in Angus
- East Ballochy solar farm
40 MW solar and 10 MW battery storage. Consented, not yet built. Angus, Scotland.
- Montreathmont Moor Forest - Solar Farm & Battery Storage
42 MW solar and 0 MW battery storage. Consented, not yet built. Angus, Scotland.
- Suttieside Farm, Suttieside Road - Solar Farm & Battery Storage
31 MW solar and 0 MW battery storage. Consented, not yet built. Angus, Scotland.
- Tealing Airfield PV
31 MW. Consent lapsed. Angus, Scotland.
- Hillend Of Lownie - Forfar Solar farm
30 MW solar and 0 MW battery storage. Refused. Angus, Scotland.
- Pyotdykes Farm, Stoneygroves, Liff - Solar Farm
28 MW. Consented, not yet built. Angus, Scotland.
- Wellbank - Solar Farm
25 MW. Consented, not yet built. Angus, Scotland.
- Arrats Mill, Arrat - Solar Photovoltaic Array
19 MW. Consented, not yet built. Angus, Scotland.