Boxted - Solar Panels
A 20 MW solar farm in Colchester, East of England. In planning. The developer on record is RES Limited.
- Size
- 20 MW
- Stage
- In planning
- Council
- Colchester
- Region
- East of England
- Developer
- RES Limited
- Application made
- November 2023
What this stage usually means
A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.
Stanfell sends new solar farms the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other solar farms in Colchester
- Layer Farm - Solar Farm
49 MW. Running. Colchester, East of England.
- Birch Solar Farm & Battery Storage
40 MW solar and 0 MW battery storage. Running. Colchester, East of England.
- Langenhoe Solar Farm
21 MW. Running. Colchester, East of England.
- Holmwood Solar Farm
19 MW. Refused. Colchester, East of England.
- Boxted Airfield solar farm
19 MW. Running. Colchester, East of England.
- Highfields Farm (Colchester) solar farm
12 MW. Running. Colchester, East of England.
- Bluegates Solar Park
11 MW. Running. Colchester, East of England.
- The Park Farm, Birds Corner - Battery Energy Storage
50 MW solar and 800 MW battery storage. In planning. Breckland, East of England.
Solar farms in the East of England · The companies behind them