Elmley Road, Minster-On-Sea - Solar Farm & BESS
A 38 MW solar and 0 MW battery storage solar farm in Swale, South East. In planning. The developer on record is British Solar Renewables Limited.
- Size
- 38 MW solar and 0 MW battery storage
- Stage
- In planning
- Council
- Swale
- Region
- South East
- Developer
- British Solar Renewables Limited
- Application made
- June 2026
What this stage usually means
A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.
Stanfell sends new solar farms the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other solar farms in Swale
- Raspberry - Solar PV
50 MW. Consented, not yet built. Swale, South East.
- Pitstock Farm - Solar Photovoltaic Panels
41 MW. Consented, not yet built. Swale, South East.
- Vigo Lane, Borden - Solar Farm
40 MW. Consented, not yet built. Swale, South East.
- Tonge Corner Farm solar farm
22 MW. Running. Swale, South East.
- Harp Farm - Solar Park
15 MW. Refused. Swale, South East.
- Bobbing solar farm
11 MW. Running. Swale, South East.
- South Lees Farm solar farm
11 MW. Running. Swale, South East.
- Orchard Farm solar farm
10 MW. Running. Swale, South East.