Leyden Road - Solar Array
A 40 MW solar farm in West Lothian, Scotland. In planning. The developer on record is Trio Power Limited.
- Size
- 40 MW
- Stage
- In planning
- Council
- West Lothian
- Region
- Scotland
- Developer
- Trio Power Limited
- Application made
- December 2025
What this stage usually means
A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.
Stanfell sends new solar farms the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other solar farms in West Lothian
- Duddingston Solar Farm and Battery Storage
30 MW solar and 20 MW battery storage. Consented, not yet built. West Lothian, Scotland.
- Trinlaymire Farm - Solar farm, Battery storage
30 MW solar and 0 MW battery storage. Consented, not yet built. West Lothian, Scotland.
- Selms Muir - Solar Farm
18 MW solar and 0 MW battery storage. Consented, not yet built. West Lothian, Scotland.
- Hagshaw Energy Cluster � Western Expansion
60 MW solar and 225 MW battery storage. In planning. Scotland.
- Springfield - Solar Farm & Battery Energy Storage
165 MW solar and 80 MW battery storage. In planning. Scotland.
- Rogerhill Solar and Battery Energy Storage System
98 MW solar and 100 MW battery storage. Consented, not yet built. Scotland.
- Bowshiel Farm - Solar Farm
165 MW. In planning. Scotland.
- Teviot Wind Farm solar farm
34 MW solar and 100 MW battery storage. Application withdrawn. Scotland.