Long Barrow Solar Farm Project
A 50 MW solar farm in East Cambridgeshire, East of England. In planning. The developer on record is Low Carbon Solar Park 42 Limited.
- Size
- 50 MW
- Stage
- In planning
- Council
- East Cambridgeshire
- Region
- East of England
- Developer
- Low Carbon Solar Park 42 Limited
- Application made
- July 2025
What this stage usually means
A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.
Stanfell sends new solar farms the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other solar farms in East Cambridgeshire
- Breach Farm - Solar farm
67 MW solar and 0.7 MW battery storage. Running. East Cambridgeshire, East of England.
- Burwell Anchor Lane Farm, Newnham Drove - Solar Panels
50 MW. Consented, not yet built. East Cambridgeshire, East of England.
- Newmarket Road, Bottisham - Solar Array
50 MW. Consented, not yet built. East Cambridgeshire, East of England.
- Burwell Solar Farm
50 MW. Under construction. East Cambridgeshire, East of England.
- Goosehall Solar Farm
40 MW. Running. East Cambridgeshire, East of England.
- Exning solar farm
30 MW. Running. East Cambridgeshire, East of England.
- North Angle Farm solar farm
29 MW. Under construction. East Cambridgeshire, East of England.
- Bracks Farm solar farm
28 MW. Running. East Cambridgeshire, East of England.
Solar farms in the East of England · The companies behind them