Mount Pleasant Farm - Solar Farm
A 35 MW solar farm in Swindon, South West. In planning. The developer on record is Belltown Power Limited.
- Size
- 35 MW
- Stage
- In planning
- Council
- Swindon
- Region
- South West
- Developer
- Belltown Power Limited
- Application made
- June 2025
What this stage usually means
A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.
Stanfell sends new solar farms the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other solar farms in Swindon
- Corner Copse Solar Farm
50 MW solar and 0 MW battery storage. Under construction. Swindon, South West.
- Wroughton Airfield Solar Park
41 MW. Running. Swindon, South West.
- Lynt Farm solar farm
27 MW. Running. Swindon, South West.
- Pentylands Farm solar farm
19 MW. Running. Swindon, South West.
- Castle Eaton Farm solar farm
18 MW. Running. Swindon, South West.
- Little Rose Lane, Blunsdon - Solar Panels
15 MW. Consented, not yet built. Swindon, South West.
- Roves Farm (Solar)
13 MW. Running. Swindon, South West.
- Lower Basset Down Farm solar farm
11 MW. Running. Swindon, South West.