New Farm House Locks Farm solar farm
A 18 MW solar farm in Winchester, South East. Consented, not yet built. The developer on record is Nextpower Spv 12 Limited.
- Size
- 18 MW
- Stage
- Consented, not yet built
- Council
- Winchester
- Region
- South East
- Developer
- Nextpower Spv 12 Limited
- Application made
- June 2021
- Consented
- June 2023
What this stage usually means
Consented and not yet built: the window in which the build is let, from the main contractor and the high-voltage connection to civil works, fencing and security.
Stanfell sends new solar farms the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other solar farms in Winchester
- Titchfield Lane, Wickham - Solar Panels
50 MW. Consented, not yet built. Winchester, South East.
- Southwick Estate solar farm
48 MW. Running. Winchester, South East.
- Three Maids Hill Solar Farm
25 MW solar and 0 MW battery storage. Running. Winchester, South East.
- South Lynch Farm - Solar Farm
20 MW. Consented, not yet built. Winchester, South East.
- Bishops Sutton solar farm
12 MW. Running. Winchester, South East.
- Bishop�s Waltham Solar Farm
12 MW. Running. Winchester, South East.
- Godsfield Solar Farm
12 MW. Application withdrawn. Winchester, South East.
- Funtley Solar Photovoltaic PV Farm
11 MW. In planning. Winchester, South East.