Ash Farm, Titchfield Lane - Battery Storage
A 15 MW battery storage site in Winchester, South East. Consented, not yet built. The developer on record is Botley Energy Reserve 2 Limited.
- Size
- 15 MW
- Stage
- Consented, not yet built
- Council
- Winchester
- Region
- South East
- Developer
- Botley Energy Reserve 2 Limited
- Application made
- May 2023
- Consented
- February 2025
What this stage usually means
Consented and not yet built: the window in which the build is let, from the main contractor and the high-voltage connection to civil works, fencing and security.
Stanfell sends new battery storage sites the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other battery storage sites in Winchester
- Widley Farm, New Down Lane - Battery Storage Facility
100 MW. In planning. Winchester, South East.
- Silkstead Farm, Poles Lane - Battery Energy Storage System
50 MW. Consented, not yet built. Winchester, South East.
- Lovedean Substation battery storage
50 MW. Application withdrawn. Winchester, South East.
- Titchfield Lane battery storage
49 MW. Under construction. Winchester, South East.
- Winchester Battery Storage
19 MW. Running. Winchester, South East.
- Stockbridge Road battery storage
10 MW. Consented, not yet built. Winchester, South East.
- Old Rides Farm, Leysdown Road - Battery Energy Storage System
1,000 MW. In planning. Swale, South East.
- Southampton Battery Energy Storage
1,000 MW. In planning. Southampton, South East.
Battery storage sites in the South East · The companies behind them