Widley Farm, New Down Lane - Battery Storage Facility
A 100 MW battery storage site in Winchester, South East. In planning. The developer on record is Leafield Energy Limited.
- Size
- 100 MW
- Stage
- In planning
- Council
- Winchester
- Region
- South East
- Developer
- Leafield Energy Limited
- Application made
- May 2026
What this stage usually means
A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.
Stanfell sends new battery storage sites the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other battery storage sites in Winchester
- Silkstead Farm, Poles Lane - Battery Energy Storage System
50 MW. Consented, not yet built. Winchester, South East.
- Lovedean Substation battery storage
50 MW. Application withdrawn. Winchester, South East.
- Titchfield Lane battery storage
49 MW. Under construction. Winchester, South East.
- Winchester Battery Storage
19 MW. Running. Winchester, South East.
- Ash Farm, Titchfield Lane - Battery Storage
15 MW. Consented, not yet built. Winchester, South East.
- Stockbridge Road battery storage
10 MW. Consented, not yet built. Winchester, South East.
- Old Rides Farm, Leysdown Road - Battery Energy Storage System
1,000 MW. In planning. Swale, South East.
- Southampton Battery Energy Storage
1,000 MW. In planning. Southampton, South East.