A 50 MW solar farm in Tandridge, South East. In planning. The developer on record is Haxted Mead Solar Farm Limited.

Size
50 MW
Stage
In planning
Council
Tandridge
Region
South East
Developer
Haxted Mead Solar Farm Limited
Application made
July 2025

What this stage usually means

A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.