Manor Farm, Sherborne - Solar Farm
A 28 MW solar farm in Basingstoke and Deane, South East. In planning. The developer on record is Solar 2 Limited.
- Size
- 28 MW
- Stage
- In planning
- Council
- Basingstoke and Deane
- Region
- South East
- Developer
- Solar 2 Limited
- Application made
- July 2025
What this stage usually means
A decision is still to come. If the site is consented, the build is let next: the main contractor, the grid connection and the civil works.
Stanfell sends new solar farms the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other solar farms in Basingstoke and Deane
- Bramley Frith Solar Farm
50 MW solar and 0 MW battery storage. Consented, not yet built. Basingstoke and Deane, South East.
- Hook Lane, Malshanger solar farm
30 MW. Consented, not yet built. Basingstoke and Deane, South East.
- Preston Farm, Preston Candover - Solar PV Array
28 MW. Consented, not yet built. Basingstoke and Deane, South East.
- Strattons Farm, Newbury Road - Solar PV Farm
23 MW. Consented, not yet built. Basingstoke and Deane, South East.
- Lower Wyke Farm, St Mary Bourne - Solar Farm
21 MW. Consented, not yet built. Basingstoke and Deane, South East.
- Beaurepaire Farm solar farm
12 MW. Refused. Basingstoke and Deane, South East.
- Upper Farm solar park
12 MW. Running. Basingstoke and Deane, South East.
- Botley West, Botley - Botley West Solar Project
840 MW. In planning. South East.