Strattons Farm, Newbury Road - Solar PV Farm
A 23 MW solar farm in Basingstoke and Deane, South East. Consented, not yet built. The developer on record is Anglo Renewables (AR Kingsclere Limited).
- Size
- 23 MW
- Stage
- Consented, not yet built
- Council
- Basingstoke and Deane
- Region
- South East
- Developer
- Anglo Renewables (AR Kingsclere Limited)
- Application made
- April 2024
- Consented
- June 2026
What this stage usually means
Consented and not yet built: the window in which the build is let, from the main contractor and the high-voltage connection to civil works, fencing and security.
Stanfell sends new solar farms the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other solar farms in Basingstoke and Deane
- Bramley Frith Solar Farm
50 MW solar and 0 MW battery storage. Consented, not yet built. Basingstoke and Deane, South East.
- Hook Lane, Malshanger solar farm
30 MW. Consented, not yet built. Basingstoke and Deane, South East.
- Preston Farm, Preston Candover - Solar PV Array
28 MW. Consented, not yet built. Basingstoke and Deane, South East.
- Manor Farm, Sherborne - Solar Farm
28 MW. In planning. Basingstoke and Deane, South East.
- Lower Wyke Farm, St Mary Bourne - Solar Farm
21 MW. Consented, not yet built. Basingstoke and Deane, South East.
- Beaurepaire Farm solar farm
12 MW. Refused. Basingstoke and Deane, South East.
- Upper Farm solar park
12 MW. Running. Basingstoke and Deane, South East.
- Botley West, Botley - Botley West Solar Project
840 MW. In planning. South East.