New Rides Farm - Photovoltaic Panels solar farm
A 10 MW solar farm in Swale, South East. Consented, not yet built. The developer on record is EnergieKontor UK Limited.
- Size
- 10 MW
- Stage
- Consented, not yet built
- Council
- Swale
- Region
- South East
- Developer
- EnergieKontor UK Limited
- Application made
- June 2021
- Consented
- September 2021
What this stage usually means
Consented and not yet built: the window in which the build is let, from the main contractor and the high-voltage connection to civil works, fencing and security.
Stanfell sends new solar farms the morning after their record moves, with a reading for your trade and, where one is found, how to reach the developer.
Other solar farms in Swale
- Raspberry - Solar PV
50 MW. Consented, not yet built. Swale, South East.
- Pitstock Farm - Solar Photovoltaic Panels
41 MW. Consented, not yet built. Swale, South East.
- Vigo Lane, Borden - Solar Farm
40 MW. Consented, not yet built. Swale, South East.
- Elmley Road, Minster-On-Sea - Solar Farm & BESS
38 MW solar and 0 MW battery storage. In planning. Swale, South East.
- Tonge Corner Farm solar farm
22 MW. Running. Swale, South East.
- Harp Farm - Solar Park
15 MW. Refused. Swale, South East.
- Bobbing solar farm
11 MW. Running. Swale, South East.
- South Lees Farm solar farm
11 MW. Running. Swale, South East.